The Bellevue Bridge Commission has announced that pavement repair work will begin on May 12 and last through June 20th on Bellevue Bridge on either side of the toll booth. The work will start on the eastbound lanes and then switch to the westbound lanes. The bridge will remain open during construction with traffic control devices in place. No tolls will be collected during this time due to the inconvenience this work will cause.